China LNG Cold Energy Utilization Facility - Leading Suppliers & Factory Solutions for Efficient Energy Savings
BLG ICE
Cold Energy Utilization FacilityLNG Cold Energy Application
- Air separator (production of liquid nitrogen, liquid oxygen, and liquid argon)
- Production of liquefied carbon dioxide gas and dry ice
- Cold storage warehouse and frozen food plant
- Skating rink and artificial snow for ski slope
Capabilities
- Energy conservation achieved by the LNG cold energy supply to facilities other than receiving terminal
- Optimal system proposal in accordance with purpose of LNG cold energy use
Application
Supermarkets
Lorem ipsum dolor sit amet consectetur adipisicing elit. Ex totam quod corporis reiciendis aliquam asperiores! Vel et sint maxime quae dolorem...
Fisheries
Lorem ipsum dolor sit amet consectetur adipisicing elit. Ex totam quod corporis reiciendis aliquam asperiores! Vel et sint maxime quae dolorem...
Slaughterhouses
Lorem ipsum dolor sit amet consectetur adipisicing elit. Ex totam quod corporis reiciendis aliquam asperiores! Vel et sint maxime quae dolorem...
Food Processing
Lorem ipsum dolor sit amet consectetur adipisicing elit. Ex totam quod corporis reiciendis aliquam asperiores! Vel et sint maxime quae dolorem...
Benefits
Customizable Design
The container-like shape and modular construction allow for easy installation and adaptability to different spaces.
Energy Efficiency
The high-quality polyurethane insulation ensures minimal energy consumption while maintaining consistent temperatures.
Durability
Built to withstand heavy usage and harsh environments, ensuring long-term reliability.
Versatility
Suitable for a wide range of products, from delicate flowers to frozen fish and fresh produce.
Technical advantages of BLG
Complete machine delivery
The machine is packed and delivered as a whole, no additional installation is required. You only need to connect the water pipe and power supply, and you can start using it without debugging.
Full frame design
The full frame design prolongs the service life of the machine and reduces the risk of parts falling off due to shaking during operation. It is convenient for crane installation.
Food standard tube ice
Quickly produce edible tube ice with built-in filtration system.
Efficient Cooling
The exclusive design of SUB cooling sets the supercooling function at the ice outlet to make the tube ice fall off more smoothly.
APPLICATION CASES
At BLG, we believe in creating solutions that lead to a sustainable future.
Europe
Lorem ipsum dolor sit amet consectetur adipisicing elit. Id, nostrum porro eius ducimus eveniet ipsum minima dolores voluptas maiores odio dicta voluptatem autem dolore sequi voluptates, error, exercitationem neque beatae.
Philippine
Lorem ipsum dolor sit amet consectetur adipisicing elit. Id, nostrum porro eius ducimus eveniet ipsum minima dolores voluptas maiores odio dicta voluptatem autem dolore sequi voluptates, error, exercitationem neque beatae.
Indonesia
Lorem ipsum dolor sit amet consectetur adipisicing elit. Id, nostrum porro eius ducimus eveniet ipsum minima dolores voluptas maiores odio dicta voluptatem autem dolore sequi voluptates, error, exercitationem neque beatae.
Malaysia
Lorem ipsum dolor sit amet consectetur adipisicing elit. Id, nostrum porro eius ducimus eveniet ipsum minima dolores voluptas maiores odio dicta voluptatem autem dolore sequi voluptates, error, exercitationem neque beatae.
After-sales system
We provide three stages of after-sales service.
Stage 1: Online guidance by technicians via video
Usually, BLG will establish a professional technical consulting group for dealers to provide after-sales service. BLG also regularly provides machine installation and maintenance training courses for dealers. We hope that dealers can become professionals to a certain extent and continue to expand their business independently.
Stage 2: Local cooperative engineering companies provide after-sales service
BLG has cooperative engineers in Indonesia and the Philippines. If necessary, our engineers can provide on-site after-sales service.
Stage 3: BLG factory engineers provide on-site after-sales service.
Under special circumstances, BLG engineers can go to the site to provide guidance and repair. Under such conditions, customers need to bear the visa fees of BLG engineers, as well as round-trip air tickets and hotels. Please note: the engineer's attendance fee is US$200/day.
About BLG
BLG is focused on refrigeration and cold chain equipment with more than ten years of experience. We have multiple functional service teams, including professional consulting, order tracking, transportation and dedicated after-sales engineering teams, providing reliable ice making and freezing solutions for global food production companies, providing worry-free one-stop service!
Frequently Asked Questions
Find answers to common questions about our facilities and services.
What applications are suitable for BLG's LNG cold energy utilization systems?
Our LNG cold energy systems are widely used in air separators (for producing liquid nitrogen, oxygen, and argon), carbon dioxide liquefaction, dry ice production, cold storage warehouses, frozen food plants, and skating rinks.
What are the technical advantages of BLG's tube ice machines?
We deliver fully assembled machines that require no on-site debugging. They feature a full frame design for durability, built-in water filtration systems for food-grade ice, and efficient sub-cooling technology to facilitate smooth ice discharge.
How is the modular cold storage facility designed for energy efficiency?
Our modular cold storage uses high-quality polyurethane insulation to minimize temperature fluctuations and reduce power consumption, while the container-like shape allows for versatile configuration in different layouts.
How does BLG handle international after-sales service?
We offer three levels of support: online video guidance with technical specialists, localized on-site service through cooperative engineering firms (currently available in Indonesia and the Philippines), and direct dispatch of BLG factory engineers for complex issues.
What are the costs associated with dispatching a factory engineer?
If factory engineers are required on-site, the customer is responsible for visa fees, round-trip airfare, hotel accommodations, and a standard service fee of US$200 per day.


